Transmission line performance and plans for the gyrotron complex on the DIII-D tokamak

J. Lohr, M. Blank, P. Borchard, S. Cauffman, M. Cengher, J. L. Doane, R. Ellis, K. Felch, Y. A. Gorelov, C. P. Moeller, S. Noraky, D. Ponce, A. Richenderfer, M. Shapiro

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

A major upgrade to the electron cyclotron heating complex on the DIII-D tokamak is underway. Two depressed collector gyrotrons are being added to the complex and the transmission lines are being upgraded. Transmission line efficiencies are being increased by reduction in the number of miter bends together with improved alignment resulting in improved mode purity.

Original languageEnglish (US)
Title of host publicationIRMMW-THz 2011 - 36th International Conference on Infrared, Millimeter, and Terahertz Waves
DOIs
StatePublished - 2011
Event36th International Conference on Infrared, Millimeter, and Terahertz Waves, IRMMW-THz 2011 - Houston, TX, United States
Duration: Oct 2 2011Oct 7 2011

Publication series

NameIRMMW-THz 2011 - 36th International Conference on Infrared, Millimeter, and Terahertz Waves

Other

Other36th International Conference on Infrared, Millimeter, and Terahertz Waves, IRMMW-THz 2011
Country/TerritoryUnited States
CityHouston, TX
Period10/2/1110/7/11

All Science Journal Classification (ASJC) codes

  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Transmission line performance and plans for the gyrotron complex on the DIII-D tokamak'. Together they form a unique fingerprint.

Cite this