Abstract
The gyrotron installation on the DIII-D tokamak has been in operation at the second harmonic of the electron cyclotron resonance since the mid-1990s. Prior to that a large installation of ten 60 GHz tubes was operated at the fundamental resonance. The system has been upgraded regularly and is an everyday tool for experiments on DIII-D.
Original language | English (US) |
---|---|
Article number | 02009 |
Journal | EPJ Web of Conferences |
Volume | 87 |
DOIs | |
State | Published - Mar 12 2015 |
Event | 18th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating, EC 2014 - Nara, Japan Duration: Apr 22 2014 → Apr 25 2014 |
All Science Journal Classification (ASJC) codes
- General Physics and Astronomy