Abstract
The DIII-D ECH complex is being upgraded with three new depressed collector gyrotrons. The performance of the existing system has been very good. As more gyrotrons having higher power are added to the system, diagnostics of gyrotron operation, optimization of the performance and qualification of components for higher power become more important. A new FPGA-based gyrotron control system is being installed, additional capabilities for rapid real time variation of the rf injection angles by the DIII-D Plasma Control System are being tested and infrastructure enhancements are being completed. Longer term plans continue to include ECH as a major component in the DIII-D heating and current drive capabilities.
Original language | English (US) |
---|---|
Article number | 02009 |
Journal | EPJ Web of Conferences |
Volume | 32 |
DOIs | |
State | Published - 2012 |
Event | 17th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating, EC 2011 - Deurne, Netherlands Duration: May 7 2012 → May 10 2012 |
All Science Journal Classification (ASJC) codes
- General Physics and Astronomy