Abstract
The high power D-T experiments on the tokamak fusion test reactor (TFTR) at the Princeton Plasma Physics Laboratory commenced in November 1993. During initial operation of the tritium systems a number of start-up problems surfaced and had to be corrected. These were corrected through a series of system modifications and upgrades and by repair of failed or inadequate components. Even as these operational concerns were being addressed, the tritium systems continued to support D-T operations on the tokamak. During the first six months of D-T operations more than 107 kCi of tritium were processed successfully by the tritium systems. D-T experiments conducted at TFTR during this period provided significant new data. Fusion power in excess of 9 MW was achieved in May 1994. This paper describes some of the early start-up issues, and reports on the operation of the tritium system and the tritium tracking and accounting system during the early phase of TFTR D-T experiments.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 209-214 |
| Number of pages | 6 |
| Journal | Fusion Engineering and Design |
| Volume | 28 |
| Issue number | C |
| DOIs | |
| State | Published - Mar 2 1995 |
All Science Journal Classification (ASJC) codes
- Civil and Structural Engineering
- Nuclear Energy and Engineering
- General Materials Science
- Mechanical Engineering
Fingerprint
Dive into the research topics of 'Operation of the tokamak fusion test reactor tritium systems during initial tritium experiments'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver