Skip to main navigation Skip to search Skip to main content

Design and performance of the 110 GHz Electron Cyclotron Heating installation on the DIII-D tokamak

  • D. Ponce
  • , R. W. Callis
  • , W. P. Cary
  • , M. Condon
  • , H. J. Grunloh
  • , Y. Gorelov
  • , R. A. Legg
  • , J. Lohr
  • , R. C. O'Neill
  • , R. Cool
  • , Y. Demers
  • , S. Raftopoulos

Research output: Contribution to journalArticlepeer-review

Abstract

The 110 GHz Electron Cyclotron Heating System on the DIII-D tokamak is being upgraded by the installation of additional gyrotrons, versatile launchers, and an improved control system. A total of six gyrotrons in the 1 MW class will be available for experiments during the 2001 experimental campaign. The installation will be described and the operational experience to date will be presented.

Original languageEnglish (US)
Pages (from-to)1121-1125
Number of pages5
JournalFusion Technology
Volume39
Issue number2
DOIs
StatePublished - 2001

All Science Journal Classification (ASJC) codes

  • General Engineering

Fingerprint

Dive into the research topics of 'Design and performance of the 110 GHz Electron Cyclotron Heating installation on the DIII-D tokamak'. Together they form a unique fingerprint.

Cite this